Clemson University
Allen N. Reeves Football Complex

CLEMSON, SC

PROJECT SUMMARY

ABC Eagle Award Winner
This LEED Silver, $55 million facility has everything a football program needs to recruit and produce the best college football team. CarolinaPower was an integral member of the design and construction team from the early planning stages. Once mobilized, CarolinaPower was one of 85+ subcontractors on a site where there were over 200 workers at any given time. A culture of teamwork among the trades was key to meeting owner expectations for safety, quality, schedule and budget.

An exceptionally complex lighting controls system consisted of individual room controllers and owner-customized room scenes. The sheer number of light fixtures (1,378 individual units), combined with 70 different types, required meticulous planning for scheduling deliveries and coordinating installation activities.

Throughout construction, we managed large volumes of changes, which steadily increased without a schedule extension. Our already tight schedule was compressed when it was declared that Clemson would be hosting National Signing Day at the Tigers’ new facility — a month sooner than the original planned move-in date. Despite the challenges, CarolinaPower’s quality of work exceeded owner expectations while still meeting the accelerated schedule.

Photo Credits

Clemson University Allen N. Reeves Football Complex

PROJECT DETAILS

LOCATION

Clemson, SC


CLIENT

DPR/Sherman


DURATION

9 months


CONTRACT VALUE

$4.9 million


SIZE

142,500 SF, 2 stories


DESCRIPTION

(2) 1600A services, (1) 500kW diesel generator, lighting control system, all low-voltage systems, medium voltage distribution system.


OPERATIONAL EXCELLENCE

SAFETY

Level 4 BIM Trimble Total Station


47,958 man-hours with ZERO lost-time incidents

CarolinaPower met the challenges, exceeded expectations, and helped us drive the project to a successful completion.
— Adam Hoots, DPR Construction